Our Projects

A Record of Technical Excellence and Delivery

Some of Our Projects

BMW Rosslyn Water Reservoir Repair

BMW Rosslyn Water Reservoir Repair

Compaction of Asphalt During Road Repair

Compaction of Asphalt During Road Repair

Compaction of G1 During Road Repair

Compaction of G1 During Road Repair

Concrete Silo Structural Integrity Assessment

Concrete Silo Structural Integrity Assessment

Corrosion Protection on Shaft Headgear

Corrosion Protection on Shaft Headgear

Demin Water Pipeline

Demin Water Pipeline

Fabricated Laanlagte and Delivery Chutes

Fabricated Laanlagte and Delivery Chutes

Fabricated Receiving Chute

Fabricated Receiving Chute

Grout Silos Refurbishment

Grout Silos Refurbishment

Headgear Concrete Plinths Repair

Headgear Concrete Plinths Repair

Headgear Corrosion Protection

Headgear Corrosion Protection

Hydraulic Room Retaining Wall Design and Construction

Hydraulic Room Retaining Wall Design and Construction

Ore Bin Refurbishment – the inside

Ore Bin Refurbishment – the inside

Ore Bin Refurbishment – the outside

Ore Bin Refurbishment – the outside

Refurbished Grout Silos

Refurbished Grout Silos

Rolled Steel Plates Installed Around the Silo

Rolled Steel Plates Installed Around the Silo

Sandblasting on Headgear Legs

Sandblasting on Headgear Legs

Silo Corrosion Protected & Painted

Silo Corrosion Protected & Painted

Silo Corrosion Protection

Silo Corrosion Protection

Silo NDT and Structural Integrity Assessment

Silo NDT and Structural Integrity Assessment

More of Our Projects

JDA Diamond tooling

Feb 2019 – June 2019

Quality System and Plant Procedures - For SASOL Mining Audit

Universal Coal

Apr 2019 - May 2019

Due-diligence study - Evaluating 3 product cyclone plant vs 2 Stage DMS Plant (Crushing, Screening and Evaluation)

Ingquza Hill Local Municipality

Apr 2019 – Mar 2022

Panel of Town Planners (Town Planning, Engineering and Project Management)

Minnie Mbali (at Kumba Iron Ore)

May 2019 - Dec 2019

Project Coordination

Mabro Engineering (Kriel Power Station)

Sep 2019 - Jan 2020

Installing and commissioning HDPE bypass line and installing a new power station demin water pipeline

Siyanda Bakgatla Platinum Mine

Mar 2020 - May 2020

Reef Silo 2 NDT (Ultrasonic), Structural Assessment and Design of Thickness Rejection Profile

Siyanda Bakgatla Platinum Mine

Mar 2020 – May 2020

Structural Repairs and Corrosion protection on Shaft Headgear

Siyanda Bakgatla Platinum Mine

Jun 2020 - Jun 2020

Modify Measuring Flask 1 and Loading Chute - Design and Implementation

Siyanda Bakgatla Platinum Mine

Jul 2020 - Aug 2020

Reef Silo 1 NDT, Structural Assessment and Design of Thickness Rejection Profile

Siyanda Bakgatla Platinum Mine

Jul 2020 - Aug 2020

Waste Silo NDT, Structural Assessment and Design of Thickness Rejection Profile

Siyanda Bakgatla Platinum Mine

Aug 2020 - Aug 2020

Modify Measuring Flask 2 and Loading Chute - Design and Implementation

Siyanda Bakgatla Platinum Mine

Jul 2020 - Aug 2020

Ash Silo NDT, Structural Assessment and Design of Thickness Rejection Profile

Siyanda Bakgatla Platinum Mine

Jul 2020 - Aug 2020

Cement Silo 2 NDT, Structural Assessment and Design of Thickness Rejection Profile

Siyanda Bakgatla Platinum Mine

Aug 2020 - Aug 2020

Compressed Air Columns modification at 14 level Belt Incline - Design and Implementation

Siyanda Bakgatla Platinum Mine

Oct 2020 - Dec 2020

Silo 2 Concrete Foundations Repair - Structural Design and Implementation

Siyanda Bakgatla Platinum Mine

Nov 2020 - Dec 2020

Construction of Silo 1 Hydraulic Room Concrete Retaining Wall - Design and Implementation

BMW Rosslyn Plant

Nov 2020 - Dec 2020

Structural Repair on Water Reservoir

Siyanda Bakgatla Platinum Mine

Feb 2021 - March 2021

Corrosion Protection on Reef Silo 1 Support Beams

Siyanda Bakgatla Platinum Mine

July 2021 – August 2021

Silo 2 NDT tests and Analysis by Engineer(Pr Eng Structural)

Siyanda Bakgatla Platinum Mine

July 2021 - August 2021

Grout Silo 1 NDT tests and Analysis by Engineer(Pr Eng Structural)

Siyanda Bakgatla Platinum Mine

July 2021 - August 2021

Grout Silo 2 NDT tests and Analysis by Engineer(Pr Eng Structural)

Siyanda Bakgatla Platinum Mine (4 South Decline Shaft)

Sep 2021 - October 2021

Concrete Silo Structural Integrity Assessment

BMW Rosslyn Plant

Nov 2021 - Nov 2021

Lay Vinyl Tiles at Engine Room

Siyanda Bakgatla Platinum Mine

Nov 2021 - Feb 2022

Headgear Corrosion Protection

Siyanda Bakgatla Platinum Mine

Nov 2021 - Feb 2022

Replace Damaged Headgear Members

Siyanda Bakgatla Platinum Mine

Nov 2021 - April 2022

Refurbish Ore-bin and Chutes and Corrosion Protection

BMW Rosslyn Plant

March 2022 – March 2022

Re-build Damaged Wall

Siyanda Bakgatla Platinum Mine

July 2022 - August 2022

NDT and Structural Analysis on Surface Silos

ATNS

Nov 2022 - March 2023

Roof and Window Leakage Repairs at Polokwane Airport

Siyanda Bakgatla Platinum Mine

Nov 2022 - March 2023

Headgear Structural Repairs and Corrosion Protection (Spud Shaft)

Siyanda Bakgatla Platinum Mine

Feb 2023 - August 2023

Silo Shell Refurbishment and Corrosion Protection

Siyanda Bakgatla Platinum Mine

August 2023 - Sep 2023

NDT and Structural Analysis on Surface Silos

Tivanathi Engineering (Rand Water Project)

July 2024 - April 2025

Project Management: The Extension of Wastewater Treatment Works at Namahadi/Frankfort (R175m)

Siyanda Bakgatla Platinum Mine

Aug 2024 – Sep 2024

Non-Destructive Testing and Structural Integrity Assessment on Silos

Siyanda Bakgatla Platinum Mine

Sep 2024 – Sep 2024

MPI NDT and Structural Integrity Assessment on Grout Plant Silos

BME Losberg Plant

Aug 2024 – Sep 2024

Innovex Plant Road Repair

BME Losberg Plant

Sep 2024 – Sep 2024

Construction of Bund Wall

BME Losberg Plant

April 2025 – On-going

Replacement of Industrial Roller Shutter Doors

Linked Consulting Engineers (SANRAL)

Feb 2025 – On-going

N1, N4, N11 Highways Street Light Assessments and Design

Siyanda Bakgatla Platinum Mine

July 2025 – August 2025

Design and Fabrication of Headgear Bin Chute Radial Door

Tivanathi Engineering

August 2025 – On-going

Project Management – Design and Construction of Gabion Walls at Eskom Tower 473

BME Losberg Plant

October 2025 – On-going

Concrete Work Repairs

AWS (Sasol)

September 2025 – On-going

Project Management – VDB Defect Verifications

Siyanda Bakgatla Platinum Mine

October 2025 – October 2025

Non-Destructive Testing and Structural Integrity Assessment on Silos

Siyanda Bakgatla Platinum Mine

October 2025 – January 2026

Grout Plant Silos Shell Refurbishment

Urban Icon (SANRAL)

March 2026 – On-going

R524 Road Lighting Design (Thohoyandou)